REPUBLIQUE DU CAMEROUN Paix - Travail - Patrie PORT AUTONOME DE KRIBI APAK REPUBLIC OF CAMEROON Peace - Work - Fatherland PORT AUTHORITY OF KRIBI
OPEN NATIONAL CALL FOR TENDERS No. 012 - /AONO/PAK/CIPM/2026 OF 16 MARS 2026 TO CARRY OUT CONSTRUCTION AND DEVELOPMENT WORKS OF A RAINWATER DRAINAGE CHANNEL.
FUNDING: Budget of the Port Authority of Kribi, 2026, 2027 and 2028 Financial Years
1- PURPOSE OF THE CALL FOR TENDERS
As part of the sanitation process of the Port Industrial Zone, the General Manager of the Port Authority of Kribi (PAK), Project Owner, hereby launches a Call for Tenders to carry out construction and development works of a rainwater drainage channel.
2- NATURE OF SERVICES
The services to be provided entail:
| 100 | PRELIMINARY STUDIES | | --- | --- | | 101 | Working drawings | | 200 | SITE WORK | | 201 | Delivering and removing equipment | | 202 | Site installation | | 300 | GENERAL EARTHWORKS | | 301 | Mass excavation and storage | | 302 | Reprofiling of existing channel (1.5 km) | | 303 | Backfill (compacted in 25 cm layers) | | 304 | Levelled crushed rock | | 400 | CIVIL ENGINEERING WORKS |
Société Anonyme à capital public - capital social : 10 000 000 000 FCFA RCCM : KBI/A/2016/86 NU Mislat2026241 Siège social à Kribi B.P. : 203 Kribi Tél. : (237) 222 46 21 00 Fax : (237) 222 46 21 00 E-mail : contact@pak.cm site web : www.pak.cm
A PAK
| 401 | Concrete channel (2000 ml) | | --- | --- | | | 150 kg/m³ dense concrete, 5 cm thick at the bottom of the excavation | | 402 | Foundation slab in rubble stone embedded in a very rich 400 kg/m³ mortar with a smoothly finished drainage surface | | 403 | Rubble stone concrete for walls (30 cm thick) with a 350 kg/m³ mortar including all installation requirements | | | Reinforced concrete culvert (L=35 m; W=2 m; H=1.5 m) | | 404 | 150 kg/m³ dense concrete, 5 cm thick at the bottom of the excavation | | 405 | Building of a reinforced concrete culvert including all installation requirements | | 406 | Bituminous paint on culvert walls | | 500 | DEVELOPEMENT WORKS | | 501 | Bank stabilisation (turfing) |
These works shall be described in detail in the DAO's Special Technical Specifications.
3- EXECUTION DEADLINE AND PLACE OF EXECUTION
The maximum execution deadline required by the Project Owner for providing these services shall be nine (9) months.
The place of delivery shall be the site of the Port Authority of Kribi located in Mboro.
4- ALLOTMENT
This Call for Tenders shall not be allotted.
5- PROVISIONAL COST
Following the preliminary studies carried out, the provisional cost of all the services shall be one billion six hundred million CFAF, all tax inclusive